Hydroseeding equipment photographed in the supplied materials

HENAN WODE HEAVY INDUSTRY CO., LTD.

ABOUT WODETEC

Equipment for revegetation. A clearer path from site brief to configuration.

ABOUT US

Hydroseeding Equipment.
Built Around Your Application.

HENAN WODE HEAVY INDUSTRY CO., LTD. develops, manufactures and sells the WHS series of hydroseeding machines for slope greening, revegetation and related applications.

Our equipment range brings tank volume, engine, pump, agitation and spraying arrangements into one selection discussion. Start with the conditions at your site and compare model-specific technical data.

The company figures below reflect a supplier assessment dated 29 June 2026, with the factory ownership description confirmed by the company.

Explore WHS equipment →
WHS hydroseeding equipment from the supplied product photographsExplore the WHS range
13,072 m²Self-owned factory area
52Full-time employees
5Production lines
17Production machines

Figures recorded in the supplier assessment dated 29 June 2026. Factory ownership description confirmed by the company.

CONFIGURATION & APPLICATION

Customisation Capability

Bring your site requirements into the equipment conversation.

01

Tank Volume

The supplied product material describes changes to tank volume. Discuss the usable capacity, dimensions and loading requirements for your project.

02

Trailer Configuration

Trailer configurations are described as an option. Confirm the exact available arrangement and its fit with access and transport requirements.

03

Model-Specific Options

Review available engine, pump, hose and control options for the selected model. Confirm order-specific availability in the quotation.

LET’S TALK ABOUT YOUR PROJECT

Get Your Equipment Brief Started

Send the site conditions, intended materials and preferred tank volume.
A clearer brief makes the equipment discussion more useful.

Discuss your requirements →

COMPANY MANAGEMENT SYSTEMS

Certificates & Credentials

Management system certificates issued to HENAN WODE HEAVY INDUSTRY CO., LTD. by Luopu Certification Center Co., Ltd.

ISO 9001:2015 management system certificate issued to Henan Wode Heavy Industry Co., Ltd.
ISO 9001:2015

Quality Management

Certificate No. 119725Q0054R0S

Issued
2025-03-05
Valid until
2028-03-04

Manufacturing of machinery and equipment for construction engineering, except for activities requiring special qualifications.

View certificate PDF →
ISO 14001:2015 management system certificate issued to Henan Wode Heavy Industry Co., Ltd.
ISO 14001:2015

Environmental Management

Certificate No. 119725E0224R0S

Issued
2025-09-12
Valid until
2028-09-11

Environmental management activities involved in manufacturing machinery and equipment for construction engineering, except for activities requiring special qualifications.

View certificate PDF →
ISO 45001:2018 management system certificate issued to Henan Wode Heavy Industry Co., Ltd.
ISO 45001:2018

Occupational Health & Safety

Certificate No. 119725S0223R0S

Issued
2025-09-12
Valid until
2028-09-11

Occupational health and safety management activities involved in manufacturing machinery and equipment for construction engineering, except for activities requiring special qualifications.

View certificate PDF →

Dates and scopes are shown from the supplied certificate copies. Continued validity is conditional on passing regular surveillance audits. These management system certificates do not certify individual products. Consult the certificate QR codes or issuer for current status.

REAL EQUIPMENT PHOTOGRAPHS

Equipment Showcase

Explore the WHS equipment views supplied in the project materials.

Equipment photographs shown here are not factory or workshop photographs. A factory gallery will follow when authorized high-resolution originals are available.

MANUFACTURING AT WODETEC

Production Capability & Process

The June 2026 supplier assessment recorded five production lines and 17 production machines. Its documented production flow includes these steps.

  1. 01Cutting
  2. 02Machining
  3. 03Welding
  4. 04Assembly
  5. 05Painting
  6. 06Debugging

Company-level process recorded in the supplier assessment dated 29 June 2026; manufacturing steps may vary by product.

DOCUMENTED CHECKS

Quality Management

The June 2026 assessment describes documented checks from incoming materials to finished products and customer feedback.

01

Incoming Materials

Written inspection instructions and related records were reported for incoming materials.

02

Finished Products

The assessment records inspection of finished products and retention of inspection records.

03

Customer Feedback

Customer complaints and feedback are recorded and followed up through written procedures and corrective actions.

Assessment findings are dated 29 June 2026. Request the inspection documents applicable to your selected equipment.

FROM REQUIREMENTS TO A PROPOSAL

Configuration Process

Selection, customised production, factory testing, technical support and spare-parts service are described in the company brief. Confirm the actual supply scope and commercial terms for your order.

  1. Define your application
  2. Review the materials
  3. Compare tank volumes
  4. Review pump & engine
  5. Discuss the configuration
  6. Confirm the quotation
Review technical support scope →
WHS15190 configuration photograph supplied with the product materials

EXPLORE THE OPERATING CONTEXT

Application Showcase

Connect your worksite to an equipment selection discussion.

Worksite photographs are illustrative. No verified customer project, exhibition participation or measured outcome is attributed.

Supplied hydroseeding worksite photograph beside a steep slope

START WITH THE PROJECT

Our Approach To Your Equipment Brief

01

Application First

Define the surface, materials and safe operating positions before choosing a tank size.

02

Model-Specific Data

Compare the exact engine, pump, working capacity and dimensional information for each model.

03

A Clear Supply Scope

Confirm the configuration, delivery, commissioning, training and warranty terms in your quotation.

TALK TO US ABOUT YOUR REQUIREMENTS

Connect With WODETEC

Choose a starting point for your equipment enquiry.

01

Equipment Selection

Compare capacity and model specifications.

Start here →
02

Configuration Review

Share tank, trailer and application requirements.

Start here →
03

Technical Documentation

Request the model and configuration information you need.

Start here →
04

Service Enquiries

Discuss delivery, training, spares and after-sales scope.

Start here →

Named team profiles and staff photographs are awaiting confirmation.

THANK YOU FOR YOUR INTEREST

Let’s Find Your Starting Point

From compact equipment to large-capacity machines, begin with your application and a clear project brief.

Additional supporting information

The company management system certificate copies are displayed above. Current certificate status remains subject to surveillance audits. Model-specific third-party test reports, named customer references, exhibition records and team profiles still require verification.

Contact us with your
equipment requirements.

Start an enquiry →View contact details